Jobs
The work Operon takes on
Every job is done end to end and approved by one of your people. Pick your industry to see its jobs.

HVAC
HVAC take-off
Equipment, duct, fittings, terminal units and devices counted across the whole set and linked to the sheet region behind each count.

HVAC
Schedule & spec reconciliation
Equipment schedules checked against the plans, and the plans against Division 23, before bid day.

Construction
Bid-stage material take-off
Valves, in-line items, instruments and line numbers counted across every P&ID in the bid package.

Construction · Energy
Revision control, IFD to as-built
Every issue diffed against the last, with the drawing evidence attached to each change.

HVAC · Construction
Submittal review
Product data compared to the governing spec section, with deviations and missing data drafted into review comments.

Construction
Turnover & handover
Line lists, tag registers and drawing indexes handed over as data, traceable tag by tag.

Energy · Construction
Brownfield digitization
Legacy scans and obsolete CAD turned into a structured register before the walkdown.

Energy · Chemicals
Management of change
Revision deltas plus everything connected to the change, so MOC reviews start from evidence.

Energy · Chemicals
LDAR coverage
Component lists drafted from the verified graph and reconciled against the LDAR register before an audit.

Chemicals
PSM documentation
P&IDs, equipment data and relief records kept current, with every change linked to its MOC.

Chemicals · Energy
PHA & HAZOP preparation
Node lists and changes since the last study drafted from current, verified P&IDs.

HVAC · Construction · Energy
Inbox triage
Every bid invitation, addendum, RFI, submittal return and quote filed against its job, with the next step drafted.

HVAC · Construction · Energy · Chemicals
Knowledge across the archive
Plain-language questions across drawings, specs and records, answered with the sheet and revision behind them.

Start with the work that costs you the most.
Tell us where your team loses the most hours. Three weeks later, an AI employee built for your company is doing that work.
