Schedule & spec reconciliation

Equipment schedules checked against the plans, and the plans against Division 23, so mismatches surface before bid day instead of on site.

All jobs
Works with
Estimators, project engineers and design-assist teams
Starts from
Plans, equipment schedules and the project specifications
Delivers
A list of conflicts, each linked to both sources

01

Summary

Drawings and specifications are produced by different people at different times, and they drift apart. A unit is scheduled at one capacity and tagged differently on the plan; a spec section calls for a product the schedule no longer lists; an addendum updates one document and not the other. Each mismatch is a pricing risk if it is missed and an RFI if it is caught.

Operon reads the schedules as tables and the plans as drawings, connects every tag across them, and checks each scheduled item against what the plans show and what the specs require. What comes back is a short list of conflicts, each with both sources side by side.

02

Inputs and outputs

What goes in

  • Equipment, fan, pump and air device schedules
  • Mechanical plans and details
  • Division 23 specification sections
  • Addenda and bulletins

What comes out

  • Items drawn but not scheduled, and scheduled but not drawn
  • Tag, capacity and model conflicts between schedule and plan
  • Schedule entries that conflict with the specs
  • Draft RFIs with both references attached

03

How it runs

01

Read the schedules as data

Operon

Extracts every schedule row, column and note into structured records.

Your team

Points out project-specific schedules or legends.

02

Connect tags across sources

Operon

Matches each tag on the plans to its schedule row and the spec section that governs it.

Your team

Confirms the tagging conventions the design team used.

03

Compare

Operon

Lists every conflict: missing items, duplicate tags, capacities or models that disagree.

Your team

Reviews the list and sets aside expected differences.

04

Raise

Operon

Drafts RFIs or clarifications with both sources cited.

Your team

Edits and sends the ones that matter.

04

What changes

When mismatches surface

Today

During construction, as change orders

With Operon

Before bid day, as RFIs

Evidence

Today

Screenshots pasted into an email

With Operon

Both sources linked in the finding

After an addendum

Today

Re-checked from memory

With Operon

The comparison re-run on the new revision

05

Checks built in

Two sources per finding

Every conflict cites the schedule row and the plan or spec location it disagrees with.

Nothing is corrected silently

Operon reports conflicts. Your team decides which document is right.

06

Getting started

Pick a recent project where schedule and plan conflicts cost you money. We run the comparison on that set first, so you can judge the findings against what actually happened.

First results within a week. Live in three weeks.

  • Plans, schedules and Division 23 for one project
  • Any RFIs or change orders that came from mismatches