NewLive in three weeksHow we deploy

JobsHVAC

HVAC take-off

Every piece of equipment, duct run, fitting, terminal unit and device counted across the whole mechanical set, with each count linked to the region of the sheet it came from.

All jobs
Works with
Estimators and preconstruction teams at mechanical contractors
Starts from
Mechanical plans, schedules and Division 23 specs
Delivers
A take-off in your estimating format, traced to the sheet

01

Summary

A mechanical bid is won or lost on the count. Estimators spend days on each set: walking every floor plan for diffusers and VAV boxes, measuring duct runs, checking the equipment schedule, then doing it again when the next addendum lands. Under a deadline, whatever nobody has time to count becomes an allowance.

Operon reads the whole set the way an estimator does. It finds the equipment, ductwork, fittings, terminal units, dampers and devices on the plans, ties each one to its schedule line and spec section, and hands your estimator a take-off where every number opens the exact region of the sheet behind it. The estimator's job shifts from counting to checking.

02

Inputs and outputs

What goes in

  • Mechanical floor and roof plans, scanned or vector
  • Equipment, air device and fan schedules
  • Division 23 specifications
  • Addenda and bulletins as they are issued
  • Your estimating template or item codes

What comes out

  • Counts by type, size and system, per floor and per sheet
  • Duct and pipe lengths by size
  • Schedule-versus-plan mismatches, flagged for review
  • An export to your spreadsheet or estimating tool
  • A link from every line of the take-off to its sheet region

03

How it runs

01

Read the set

Operon

Reads every sheet, learns the legend and symbol conventions from the cover sheets, and finds each item on the plans.

Your team

Sends the set and the template they price from.

02

Tie counts to schedules

Operon

Links each unit on the plans to its schedule line and spec section, and lists what is drawn but not scheduled, or scheduled but not drawn.

Your team

Decides how each mismatch is priced or raised as an RFI.

03

Verify

Operon

Routes anything below its confidence threshold to review, with the sheet region open beside it.

Your team

Confirms or corrects the flagged items, usually in minutes per sheet.

04

Export and re-run

Operon

Exports in your format and, when an addendum arrives, re-reads what changed and shows the delta.

Your team

Prices the take-off and the changes.

04

What changes

Coverage

Today

A sample of sheets, allowances for the rest

With Operon

Every sheet in the set counted

Checking a number

Today

Find the sheet, find the area, recount

With Operon

One click to the region behind the count

Addenda

Today

Recount the affected sheets by hand

With Operon

A delta of what changed, item by item

Schedule mismatches

Today

Found on site, priced as change orders

With Operon

Flagged before bid day

05

Checks built in

A confidence score on every item

Anything uncertain goes to a person before it reaches the estimate.

Counts you can trace

Each quantity links to the sheet, revision and region it came from.

The set's own legend

Symbols are read against the legend on the drawings, not a generic library.

06

Getting started

Send one recent bid set and the take-off your team produced for it. We run Operon on the same set and walk your estimators through every difference.

First results within a week. Live in three weeks.

  • One complete mechanical set with schedules and specs
  • Your estimating template or export format
  • The take-off your team did, for comparison

Start with the work that costs you the most.

Tell us where your team loses the most hours. Three weeks later, an AI employee built for your company is doing that work.