NewLive in three weeksHow we deploy

JobsChemicals

PSM documentation

P&IDs, equipment data and relief records kept current, with every change linked to the MOC that made it.

All jobs
Works with
Process safety engineers and PSM coordinators
Starts from
P&IDs, equipment files and relief device records
Delivers
Process safety information that stays in step with the plant

01

Summary

Process safety management depends on accurate process safety information: current P&IDs, equipment design data, and the relief system design and its basis. Keeping all of it current is a standing job that competes with every other priority, and it is one of the first things an audit looks at.

Operon keeps the process safety information as one connected, verified graph. When a drawing changes, it shows which equipment records, relief device data and procedures are affected, and it tracks each update back to its MOC. Engineers see what is out of step before an audit or a PHA does.

02

Inputs and outputs

What goes in

  • Current P&IDs
  • Equipment files and datasheets
  • Relief device records and sizing basis documents
  • MOC history

What comes out

  • A connected index of the PSI by unit and tag
  • Records that are out of step with the current drawings
  • Each update linked to its MOC
  • A ready view of the PSI for any unit, for audits and PHAs

03

How it runs

01

Index the PSI

Operon

Reads drawings, datasheets and relief records, and links them by tag.

Your team

Points to where each type of record lives.

02

Find what's out of step

Operon

Compares the records against the current drawings and lists mismatches.

Your team

Reviews and assigns corrections.

03

Link to MOCs

Operon

Ties each change to the MOC that authorised it.

Your team

Confirms the links.

04

Keep it current

Operon

Re-checks whenever a drawing or record changes.

Your team

Signs off each update.

04

What changes

Currency

Today

Checked ahead of audits

With Operon

Checked whenever something changes

Tracing a change

Today

Search emails and MOC folders

With Operon

Each record links to its MOC

Before a PHA

Today

Weeks spent confirming what's current

With Operon

The current state, already linked

05

Checks built in

No silent edits

Operon flags and drafts. The PSI changes only when an engineer signs.

Every value sourced

Each value links to the document it came from.

06

Getting started

Pick one unit and share its P&IDs, equipment files and relief records. We return the connected index and the list of records out of step, for your engineers to check.

First results within a week. Live in three weeks.

  • Current P&IDs for one unit
  • Equipment files and relief device records for it
  • Its MOC history

Start with the work that costs you the most.

Tell us where your team loses the most hours. Three weeks later, an AI employee built for your company is doing that work.