NewLive in three weeksHow we deploy

JobsEnergy · Chemicals

Management of change

Revision deltas plus everything connected to the change, so MOC reviews start from evidence instead of a search through the drawings.

All jobs
Works with
Process and operations engineers, MOC coordinators
Starts from
The proposed markup and the current P&IDs
Delivers
A change package: what changes, what it touches, what needs updating

01

Summary

Every MOC asks the same questions: what exactly is changing, what else does it touch, and which documents have to be updated afterwards. Answering them means tracing lines across sheets, finding the instruments and relief devices involved, and checking procedures and registers. It is slow, and whatever gets missed becomes a gap in the process safety information.

Operon compares the proposed change with the current, verified drawings, lists every added, removed and modified item, and follows the connections: the lines, instruments, relief devices and equipment linked to the change, and the documents that reference them. The review starts from a complete picture, and the close-out has a checklist.

02

Inputs and outputs

What goes in

  • The proposed markup or revised drawings
  • Current P&IDs for the affected units
  • Relief device, equipment and instrument registers
  • Procedures and documents that reference the affected tags

What comes out

  • A structured diff of the change
  • Connected items: lines, instruments, relief devices and equipment
  • Documents that need updating, listed by tag
  • A close-out checklist linked to the MOC

03

How it runs

01

Diff the proposal

Operon

Compares the markup with the current drawings, item by item.

Your team

Submits the change as usual.

02

Follow the connections

Operon

Traces every line and device connected to the changed items, across sheets.

Your team

Reviews the impact list in the MOC meeting.

03

List the updates

Operon

Lists the drawings, registers and procedures that reference the affected tags.

Your team

Assigns an owner to each update.

04

Close out

Operon

Checks that each update was made before the MOC closes.

Your team

Approves the close-out.

04

What changes

Impact review

Today

Built from memory and a drawing search

With Operon

Starts from the full list of connected items

Document updates

Today

Missed ones found at the next audit

With Operon

Listed, assigned and checked at close-out

The record

Today

Scattered across emails

With Operon

Linked to the MOC

05

Checks built in

Engineers decide

Operon lists what a change touches. Risk judgments stay in the MOC review.

Against verified drawings

Deltas are computed against drawings your team has verified.

06

Getting started

Send a closed MOC with its markup and the P&IDs it changed. We produce the change package for it, so your team can compare it with what the review actually covered.

First results within a week. Live in three weeks.

  • One closed MOC and its markup
  • The P&IDs before the change
  • The documents updated at close-out

Start with the work that costs you the most.

Tell us where your team loses the most hours. Three weeks later, an AI employee built for your company is doing that work.