A handover package as connected, verified data

01

Summary

At handover, the owner receives thousands of documents and is expected to run a facility from them. Registers are assembled in spreadsheets at the end of the project, often by people who didn't build it, and the gaps show up years later, during a turnaround or an incident.

Operon builds the handover as the project goes: tags, lines and equipment read from the as-builts, verified, connected to their datasheets and vendor documents, and delivered as data. The owner gets a register they can query, with every entry traceable to the drawing behind it.

02

Inputs and outputs

What goes in

  • As-built P&IDs, isometrics and layouts
  • Equipment and instrument datasheets
  • Vendor documentation
  • The owner's handover specification

What comes out

  • Tag, line and equipment registers in the owner's format
  • Every entry linked to its as-built sheet and datasheet
  • A gap list: tags without data, and data without tags
  • A package the owner can query, not a folder of PDFs

03

How it runs

01

Read the as-builts

Operon

Reads tags, lines and equipment from the as-built drawings into a verified register.

Your team

Confirms the items Operon routes for review.

02

Connect the documents

Operon

Links each tag to its datasheet, vendor documents and the revisions that changed it.

Your team

Points to where vendor data is kept.

03

Check against the handover spec

Operon

Measures completeness against the owner's requirements and lists the gaps.

Your team

Closes the gaps with vendors and the field.

04

Hand over

Operon

Exports in the owner's format and keeps every link intact.

Your team

Signs the package.

04

What changes

Registers

Today

Assembled in spreadsheets at the end

With Operon

Built and verified during the project

Gaps

Today

Found by the owner, years later

With Operon

Listed before handover

Format

Today

Folders of PDFs

With Operon

Data the owner can query

05

Checks built in

Every entry traceable

Each register entry links to its as-built drawing and the document behind it.

The owner's spec as the checklist

Completeness is measured against what the owner asked for.

06

Getting started

Send the owner's handover specification and one system's as-builts. We build that system's registers and gap list so you can see the package before committing the project.

First results within a week. Live in three weeks.

  • The owner's handover specification
  • As-builts and datasheets for one system
  • Any registers already assembled

Start with the work that costs you the most.

Tell us where your team loses the most hours. Three weeks later, an AI employee built for your company is doing that work.